Pro Desk Mon–Fri, 7 AM–5 PM ET·Melville, NY · Stuart, FL · Toronto, ON
Cast iron manhole riser between a manhole frame and its cover, shown on a freshly paved road

RAISE COVERS
TO GRADE.
SKIP THE
EXCAVATION.

Manhole, catch basin and valve box risers that sit in the frame already in the road. Lift the cover, set the riser, pave the same day. No digging, no new concrete, no rebuilt frames.

192 standard parts
Custom sizes from field measurements
Spec sheets with every quote
THE PROBLEM ON EVERY OVERLAY

THE ROAD RISES.
THE COVERS GET
LEFT BEHIND.

A new overlay lifts the road. Every manhole and catch basin frame stays where it was, so each cover ends up sitting in a dip below the new surface. There are two ways to fix that.

Hydraulic breaker cutting into the road around a structure
THE OLD WAY
THE OLD WAY

DIG, REBUILD, WAIT.

  • Saw-cut the asphalt around the frame
  • Dig out the frame and rebuild it in concrete
  • Keep the lane closed while the concrete cures
A crew, concrete and a closed lane for every frame.
WITH A RISER

LIFT, DROP IN, PAVE.

  • Lift the cover off the existing frame
  • Drop the riser onto the frame seat
  • Put the cover back and pave straight over
No excavation. No concrete. No waiting.
Why paving crews choose us

Risers that fit the first time.

A riser that doesn't seat stops the paver and costs you a day. That's why we make our own, and why every order is checked against your frame before we start. We're the manufacturer, not a middleman.

Molten iron being poured from a ladle at the Paving Risers foundry
Our foundry

We pour the iron.
We cut the steel.
We ship the riser.

No broker between you and the people making your part, so sizes, dates and answers come straight from the shop floor.

On the shelf
192

Standard risers, ready to ship.

Browse the range→
A probe checking the dimensions of a finished riser ring
Measured before it ships
The fit check

Checked against
your frame
before we make it.

Send four measurements. An engineer confirms the riser will seat before we cast or cut it.

Section through a manhole frame with the four measurements A to D
3/4"–6"Rise range, in 1/4" steps
3 officesMelville NY, Stuart FL and Toronto ON
[XX] yearsMaking road and utility castings
WHO WE SERVE

BUILT FOR THE
PEOPLE WHO PAVE.

Contractors, cities, utilities and engineers all buy risers for different reasons. Here's what each of them gets from us.

Paving contractors

YOU NEED

Parts on site the morning you pave.

  • Stock sizes ready to ship
  • Delivery to your yard or the job
For contractors

Municipalities & DOTs

YOU NEED

Parts that match your standard details.

  • Spec sheets and certificates for review
  • Pricing for annual contracts
For agencies

Utility companies

YOU NEED

Valves you can still reach after paving.

  • Valve box and gas risers
  • Made to your box size
For utilities

Engineers & specifiers

YOU NEED

Data you can drop into a spec.

  • Drawings and CAD files, free
  • Help sizing from field data
For engineers
Know your riser

WHAT A RISER DOES.
WHICH ONE YOU NEED.

A riser sits on the seat of the frame that's already in the road and lifts the cover to the new surface. Choosing one takes three steps: the structure, the type of riser, then the size.

MANHOLE RISER
Manhole cutaway showing riser seated between frame and cover
CATCH BASIN RISER
Catch basin cutaway showing assembly
1

Lift the cover

After the new course is laid

2

Drop in the riser

It sits on the existing frame seat

3

Cover back at grade

Flush with the new surface

02

PICK THE TYPE

Is the frame in good shape?

This step isn't about size. It's about how the riser holds in the frame: a solid ring that sits on the seat, or a steel ring that expands to grip a frame that's worn or out of round.

LOWEST COST

FIXED

Solid cast iron ring

Solid cast iron manhole riser
Sits on the frame seat

One solid piece. No moving parts.

Rise2" or 3" · stack for more
0"1"2"3"4"5"6"
Handles worn framesLow
Cost$
BEST FORStandard frames in good shape
Fixed risers →
MOST FORGIVING

ADJUSTABLE

Expanding steel ring

Adjustable expanding steel manhole riser
Expands against the frame

A steel screw locks it tight. No mortar.

RiseFrom 3/4"
0"1"2"3"4"5"6"
Handles worn framesHigh
Cost$$
BEST FOROld, worn or out-of-round frames, thin overlays
Adjustable risers →
03

SEND THE SIZE

We match the part

Size comes from the frame itself. Four measurements are enough for us to match a catalog part or make one to fit.

Four measurements, one quote. Not sure which type you need? Send a photo of the frame and your overlay depth too.

Why our risers hold

Zero shifting. Flawless grades. Built to last.

A riser has one job: keep the cover flush with the road for as long as the road lasts. Here's how ours do it.

01Zero shifting

Locked to the frame. Adjustable rings expand against the casting with a steel screw, so there's no mortar to crack and nothing to work loose.

Machined seats. The cover sits flat and tight, so it doesn't rock or rattle under traffic.

02Flawless grades

Rises in 1/4" steps from 3/4" up, so the cover finishes flush with the new surface, not close to it.

Sloped and tapered rings follow the crown on cambered roads.

03Built to last

Gray iron, ductile iron and A36 steel, black-coated or hot-dip galvanized against salt and water.

Low profile. Set flush, so traffic and snowplow blades ride straight over.

Adjustment products

The parts that keep the promise.

Each one exists to stop a cover shifting or sitting off grade.

All adjustment products
Zero shifting
Expanding steel rings

Expanding steel rings

A steel screw locks the ring inside round frames.

View
Zero shifting
Screw-adjust risers

Screw-adjust risers

Set screws take up a worn or uneven frame.

View
Flawless grades
Catch basin riser frames

Catch basin riser frames

Square and rectangular, in 1/4" rise steps.

View
Flawless grades
Sloped and tapered rings

Sloped & tapered rings

Thicker on one side to follow a road crown. Made to order.

Ask about a slope
WORLD OF RISERS

WHERE RISERS
GO TO WORK.

Highways, airport aprons, city streets and storm drains. Wherever a surface gets renewed, the castings in it have to come up to meet it.

MADE IN OUR FOUNDRY

WATCH YOUR
RISERS BEING BUILT.

From raw plate and molten iron to a finished, coated riser on a pallet. Every step happens in our own plant, which is why we can promise sizes and dates.

Robotic welders joining a steel riser ring inside a welding cell

From steel plate to finished riser

1 min · cutting, forming, welding, coating, inspection

Laser cutting a ring blank from steel plate
LASER CUT
Coated risers moving through a curing oven
COATED & CURED
Probe checking the dimensions of a finished riser ring
INSPECTED
01

Cast or cut

Gray and ductile iron poured in sand molds. Steel blanks laser-cut from plate.

02

Form & weld

Rings rolled and pressed to size, then welded in robotic cells.

03

Machine & coat

Seats machined flat. Black coating or hot-dip galvanizing, oven-cured.

04

Inspect & ship

Every size checked against its drawing, labeled, palletized and shipped.

STANDARDS & CERTIFICATIONS

MADE TO THE
SPECS ON
YOUR DRAWINGS.

Material certificates come with every order. Test reports are ready for your submittal.

ASTM
A48

Gray iron, Class 35B

ASTM
A536

Ductile iron

ASTM
A36

Structural steel

AASHTO
H-20

Highway traffic loading

ADA
705

Detectable warning plates

Projects & testimonials

Proven on
real roads.

Real jobs and real customers, shared with their permission.

All projects
Job photo
[CITY, STATE]

[Number] manholes raised in one overlay

Problem
[Length] mill-and-fill, every cover left low
Product
Adjustable manhole risers
Result
[Lane reopened the same day]
Job photo
[CITY, STATE]

[Number] catch basins raised without rebuilding

Problem
Non-standard frames on a tight schedule
Product
Fabricated steel risers
Result
[Result]
Job photo
[UTILITY OR AGENCY]

[Number] valve boxes kept reachable

Problem
Valves buried under new asphalt
Product
Valve box risers
Result
[Result]
“
[Quote from a paving contractor: a job where the risers fit and the crew kept paving.]
[Name]·[Title, Company, City]
Services & solutions

More than a
parts counter.

The work around the part: getting the size right, getting it approved, and getting it to the job on time.

All services

Custom fabrication

Send a drawing or field sizes and we'll make a riser, grate or frame to match. One piece or a full project.

Engineering help

We check your measurements, recommend fixed or adjustable, and catch problems before anything is made.

Submittal packages

Spec sheets, drawings and material certificates, put together for your bid or agency review.

Jobsite delivery

Palletized freight to your yard or straight to the job, or will-call pickup in Melville and Stuart.

What we need from you

Four
measurements.
One
accurate quote.

A

Cover diameter

Measure straight across the top of the cover.

B

Cover thickness

Measure the edge of the cover where it sits in the frame.

C

Inside clear opening

Measure the open space inside the frame, below the seat.

D

Height to raise

How far the cover has to come up to meet the new surface.

Ordering something other than a manhole riser? Catch basin and valve box risers, grates, plates and custom parts all work the same way: send the size of what's in the road, its thickness, the clear opening and the rise you need. A photo of the maker's name cast on the frame helps too.

Section through a manhole frameNot to scale
NEW SURFACEABCDEXISTING FRAME STAYS IN PLACE
Resources

Size it. Spec
it. Install it.

Everything you need to choose and fit a riser. Free to download, no sign-up.

All resources
PDF · DWG
Catalog & CAD files

Catalog & CAD files

Spec sheets and drawings for all 192 parts.

VIDEO
Installation guides

Installation guides

Short videos and printable steps for each riser.

TOOL
Riser height calculator

Riser height calculator

Work out the rise from milling and overlay depth.

FAQ
?

Questions & answers

Stacking, sizing, lead times and more.

Common questions
No. The riser sits on the seat of the existing frame and the cover goes back on top at the new height. No excavation and no new concrete.
Offices & locations

Close to your job.

Three offices, one sales desk. We ship palletized freight across the US and Canada, with will-call pickup in Melville and Stuart on 24 hours' notice.

Toronto, ON
Melville, NY
Stuart, FL

Melville, New York

NY
105 Maxess Road, Melville, NY 11747
Mon–Fri, 7 AM–5 PM ET · Will-call pickup

Stuart, Florida

FL
850 NW Federal Highway, Stuart, FL 34994
Mon–Fri, 7 AM–5 PM ET · Will-call pickup

Toronto, Ontario

ON
1 Yonge Street, Toronto, ON M5E 1R4
Mon–Fri, 7 AM–5 PM ET · Sales office
Let's build together

Send the frame
size.
We'll
handle the rest.

Price, lead time and a spec sheet, back within [one business day]. Buying for a season or a whole city? Ask for bulk pricing and we'll set up contractor rates.

STEP 01

We check your measurements

STEP 02

You get price and lead time

STEP 03

We ship to your yard or job

Takes about 2 minutes. Fields marked optional can be skipped.

Attach drawings or photos (optional)PDF, JPG, DWG or a structure list, up to 20 MB
We only use your details to reply to this request. Privacy policy